The Parks and Recreation Department has capital improvement projects slated yearly, and we want your park improvement ideas.


Eagan Invests in Parks & Recreation Facilities

We are planning our future fun, connections, and spaces, so we all can thrive.

Eagan residents love their parks and recreation opportunities. Nearly nine in 10 residents rate our parks a priority, and we work to reflect that community value. Our community boasts an extensive parks system with 60 parks and wide-ranging facilities and amenities, including trails, a water park, a splash pad, an ice arena, outdoor rinks, a community center, pavilions, accessible spaces, neighborhood play areas, and more.

Keeping Parks Current and Inclusive

“Over the past 10 years, we've re-envisioned and built many of the city's parks and public spaces to meet the needs of our growing and diversifying community,” says Andrew Pimental, Eagan's director of Parks & Recreation.

Besides the amenities mentioned above, Parks & Recreation has focused on building pickleball courts to cater to local fans of America's fastest-growing sport, adding inclusion spaces like Nature Play at Patrick Eagan Park and Destination All-Play at Woodhaven Park, and updating historical sites like Holz Farm to serve as learning venues for future generations.

“The City of Eagan is committed to making sure parks and recreation are available for all ages, interests, and abilities and we're always planning for our future,” Pimental says. “In 2019, we began studying how our parks and recreation facilities will need to evolve to serve you, your neighbors, and our future.”

Planning to Improve Recreation Facilities

We know how much our community values our 60 parks, our community facilities, and our green spaces. In fact, nearly all residents rate our parks and recreation opportunities positively and as a top City priority. We work to reflect those values.

Each year we look at our Eagan park system plan to ensure that our parks serve everyone. Here are a few projects we're investing in this year to keep our parks, buildings, and community vibrant in 2023 and beyond.

  • Eagan Art House logo

    Eagan Art
    House

    Your place to create and connect

  • Goat Hill icon

    Goat Hill Park and Skating Rink

    Winter play destination

  • Eagan Community Center logo

    Eagan Community Center

    A hub for community


What's next for these facilities?


  • Eagan Art
    House

    Planning how to create space for our thousands of users

  • Goat Hill Park and Skating Rink

    Design and planning of shelter/pavilion project

  • Eagan Community Center

    Planning and adjusting programs and amenities to serve everyone

Timeline

Next Steps for Three Key Spaces

That 2019 study found that our current facilities are aging and need updates, so in the coming years the City is planning to invest in the following parks and recreation facilities:

Eagan Art House: Now Open

Updating Your Place to Create: Building a New Eagan Art House

For more than 25 years, the Eagan Art House has been our community's place to create and connect. In fact, thousands of artists have visited the old 1960s rambler-style building every year since 1997. It was no surprise to users or staff that we needed a new art facility.

The new design integrates with Patrick Eagan Park, showcasing its beauty, and includes land restoration to a native oak savannah. An enhanced air filtration has improved safety, and a commitment to sustainability guided construction and maintenance. The new Art House had a soft opening this past spring, and the grand opening will take place Saturday, Sept. 13 from 12–4 p.m.

Goat Hill Park: Now Open

Goat Hill Park is a winter play destination for skating, hockey, and more. A partnership with the Eagan Hockey Association allowed the City to install a refrigerated rink in the fall of 2022 to better support the community's winter activities. To expand this amenity, a new shelter and pavilion will make the space even more of a winter destination and a year-round amenity.

We are excited to have you enjoy the new winter destination at Goat Hill Park!

Goat Hill collage of picures
goat-shelter.webp
previous arrow
next arrow
 

Eagan Community Center

In 2024, City staff have been preparing the ECC Reinvestment Project, which will bring exciting upgrades to the Eagan Community Center (ECC). Improvements include a new upper-level fitness center, a larger group fitness studio, a dedicated personal training room, more bathrooms, new meeting and event spaces, a relocated and upgraded senior room, a new elevator, a renovated indoor playground, and an updated lobby and staircase.

Save the Date

The project will begin in fall 2024 and continue through 2026, with phased construction to minimize disruptions. Thank you for your patience and continued support as we enhance the ECC.

ecc1.webp
previous arrow
next arrow
 

2026 Park Projects

Quarry Park Building

The City of Eagan is planning our future fun, connections, and spaces, so we all can thrive. As a part of our future planning, we are continuing to update Quarry Park for current and future needs.

Background on Quarry Park

Quarry Park has seen multiple phases of park redevelopment over the last few years. Eight pickleball courts were installed at the site, making it the first pickleball court complex in Eagan. Then, bocce ball courts were added to the park. These two amenities have made Quarry Park a seasonal destination.

The current bathroom and shelter building provides a small outdoor gathering space, a single small meeting room, and bathrooms. The new potential design provides multiple benefits, including ADA accessible restrooms, extendable exterior shade, and better building orientation to provide improved access to all park users.

Black and white rendering of the new shelter at quarry park
  • Contractors/Consultants: Nor-Son
  • Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Project Cost Estimate: $1,000,000
  • Location: 3340 Coachman Rd
Event Est. Start Est. Completion
Advertisement for Bid/Request for Proposals Winter 2025 Winter 2025
Public Comment November 17, 2025 November 17, 2025
Construction Period September 2026 Spring 2027
Opening Date Spring 2027 Spring 2027



Playground Installations

Annually, the parks and recreation department selects playgrounds for replacement based on the age and quality of the existing play features. Typically, playgrounds are replaced around every 20-25 years.

Walnut Hill Park

The Walnut Hill Park playground has been sparking fun since 2003—and after 23 years of play, it’s time for an exciting upgrade!

Concepts

Click images for larger versions.

  • Contractors/Consultants: Flagship Recreation
  • Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Project Cost Estimate: $80,000
  • Location: 999 Wilderness Road
Event Est. Start Est. Completion
Advertisement for Bid/Request for Proposals Dec. 2025 Jan. 2026
Public Comment Jan. 2026 Jan. 2026
Construction Period Fall 2026 Fall 2026
Opening Date Fall 2026 Fall 2026


Peridot Path Park

After 25 amazing years of play, the Peridot Path Playground has now been renovated. Due to ADA compliance, the playground location has been shifted to another portion of the park. The playground was redesigned with lower-level play features to accommodate smaller children.

The new Peridot Path playground
  • Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.
  • Location:  1790 Turquoise Trail

Northview Park – Tennis Court Rehabilitation

The 11 tennis courts and supporting amenities at Northview Park are scheduled for significant improvements in 2026. These public courts serve a wide range of users, including community members as well as local high school and middle school athletic programs.

The City of Eagan works in partnership with Independent School District 196 through a Joint Powers Agreement established in 1987, which supports the shared development, use, and maintenance of the tennis facilities at Northview Park.

After more than 35 years of continuous use, the courts are in need of repair and rehabilitation. The project will include extensive earthwork and paving to restore each tennis court pod to safe, durable, and high-quality playing conditions. Planned improvements also include enhanced ADA-accessible entrances and stormwater management upgrades to support long-term site sustainability.

Project Details

  • Contractor: Northwest Asphalt
  • Consultant/Engineer: Bolton & Menk
  • Staff Lead: Chris Fleck, Parks Superintendent
  • Estimated Project Cost: $2,000,000
  • Location: 980 Northview Park Road, Eagan, MN 55123
Event Est. Start Est. Completion
Bid Date Jan. 2026
Construction Period May 2026 Fall 2026

Northview Courts Aerial View

Looking for other court options? These other courts will be open during this project:

  • Sky Hill Park (3590 Blue Cross Rd)
  • Bur Oaks Park (3421 Rolling Hills Drive)
  • Oak Chase Park (400 Oak Chase Road (and Wilderness Run)
  • Rahn Park (4425 Sandstone Drive)
  • Highview Park (1435 Skyline Drive)

Project Updates & Notices

  • School Parking
    • Questions related to school or student parking should be directed to Independent School District 196 staff. The City is not managing school-related parking during this project.
  • Construction Start & Court Closure
    • Construction is anticipated to begin on May 4, 2026. All tennis courts will be closed for play for the duration of construction until the project is complete.
  • Disc Golf Impacts
    • Disc golf holes located near the project area will be impacted during construction. Temporary disruptions should be expected. Any necessary course adjustments or corrections will be evaluated and implemented following project completion.

Caponi Art Park - Natural Resources Management Plan

The City of Eagan is working in partnership with Dakota County and Friends of the Mississippi River to restore and enhance nearly 40 acres of oak forest and savanna habitat within Caponi Art Park. The goal of this project is to bring back the ecological function of the oak woodlands that were historically present before Euro-American settlement. The work to achieve this goal will begin this December, as we’ve hired restoration company Resource Environmental Solutions to remove invasive buckthorn and honeysuckle shrubs throughout the winter while the park is closed. The removal of these dense shrub layers will open up the understory of the forest to allow for the establishment of native plants. The open understory will also help in the recruitment of younger age classes of oaks, the seedlings of which need ample sunlight to grow and ensure their survival in the future forest community.

There will be opportunities to get involved, as we need your help to remove invasive species such as garlic mustard, and replace them with native wildflowers, grasses and sedges indicative of a healthy oak woodland. Watch for future announcements about volunteer events in 2026, or reach out to Chris Klatt, Natural Resources Specialist at Dakota County Parks via email at This email address is being protected from spambots. You need JavaScript enabled to view it. or phone at 952-891-7947 for more information about how you can help.

Caponi Art Park Maps


Clearwater Park Demo Project

The City of Eagan plans to remove the existing warming house at Clearwater Park in fall 2026. Outdoor skating will continue as planned at Clearwater Park following removal of the building (depending on winter weather), with the park continuing to provide a general, non-refrigerated ice surface for recreational skating.

The warming house has reached the end of its useful life and would require significant investment to repair or replace. As part of the City’s Parks Master Plan and ongoing review of park assets, the City considered the condition of the building, current and historical use, community needs, and the level of investment that would be required to maintain the facility. Given the condition of the existing structure, removal would be necessary regardless of whether future improvements or reinvestment occur at Clearwater Park. Based on that review, removal of the warming house was identified as the appropriate next step.

This project is part of Eagan's Parks Master Plan’s "4R" approach: Replace, Remove, Repair, and Reimagine. This approach helps guide decisions about aging park facilities and amenities. The goal is to make thoughtful investments across Eagan’s park system based on facility condition, community use, changing needs, and long-term financial sustainability.

Should future reinvestment or improvements be identified for Clearwater Park, those projects would be considered through the City’s five-year Capital Improvement Plan (CIP) process.


2025 Park Projects

Parks Master Plan

Parks and recreation are an essential community service that provides health and environmental benefits, economic value, and social connections. A strong and active park system is key to enjoying a high quality of life. This system also plays a crucial role in protecting natural resources for future generations. The City of Eagan has built a comprehensive park system over the last 60 years, providing spaces for its residents to recreate, exercise, learn, gather together, and enjoy nature and solitude. As demographics, recreation trends, and environmental conditions in Eagan continue to evolve and change, a flexible and adaptable park system plan is necessary to meet changing needs. This update to the Parks & Recreation System Plan is part of the City of Eagan's 2040 Comprehensive Plan Update. It builds upon the Eagan Park Plans (1983 & 1995), the 20/20 Vision Plan for Parks, Recreation, and Open Space (2006), and the City's recently completed Eagan Forward (2016) vision plan.

Contractors/Consultants: HKGi
Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.
Project Cost Estimate: $150,000

Additional Projects

Cedar Pond Park Playground Installation
The completed Cedar Pond Park playground with trees in the background

The Cedar Pond Playground replacement is complete and is now open.

Contractors/Consultants: Landscape Structures / Flagship Recreation
Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.
Project Cost Estimate: $115,000
Location:  2070 Garnet Lane

Event Est. Start Est. Completion
Advertisement for Bid/Request for Proposals November 2024 December 2024
Public Comment March 3, 2025 March 17, 2025
Construction Period Construction Season 2025 Construction Season 2025
Opening Date Fall 2025 Fall 2025
LeMay Lake Fishing Pier at Moonshine Park

The City of Eagan is enhancing outdoor recreation opportunities by adding a new fishing pier at Moonshine Park on LeMay Lake. This project supports community access to the lake while improving inclusivity and the overall park experience.

Read about the update in the current edition of Experience Eagan.

Concepts

Click images for larger versions.

Project Overview

The project includes the installation of a prefabricated, boardwalk-style fishing pier system, along with an ADA-accessible bituminous walkway to ensure safe and inclusive access for all visitors. Work also involves site grading and restoration to protect the shoreline and surrounding environment.

Timeline

Construction is scheduled to begin in October 2025, with the goal of opening the new pier for community use by Spring 2026.

Funding

A $60,000 grant from the Minnesota Department of Natural Resources (MN DNR) has been secured to support the project’s funding.

Project Details

  • Contractor/Consultant: Blackstone Contractors, LLC
  • City Staff Leads: Jenna Olson, Water Resources Manager & Chris Fleck, Parks Superintendent
  • Estimated Cost: $170,000
  • Location: Moonshine Park, 1321 Jurdy Rd, Eagan, MN 55121
Milestone Est. Start Est. Completion
Council DRN Approval October 2024  
Design/Architecture Review December 2024 June 2025
RFQs Due July 2025  
Council Contract Approval July 2025  
Construction Period September 2025 January 2026
Opening Date Spring 2026  
Northview Park Restroom Improvements

The City of Eagan is investing in improved park experiences by renovating restrooms at Northview Park.

Concepts

Click images for larger versions.

Project Scope

  • East Restroom Building (near the softball/baseball fields): full replacement
  • West Restroom Building (near the soccer/football fields): interior remodel

Demolition is scheduled to begin in August 2025 to have both restrooms ready for use by Spring 2026 activities.

Project Details

  • Contractor/Consultant: Nor-Son Construction
  • Staff Lead: Chris Fleck, Parks Superintendent
  • Estimated Cost:
    • East Restroom & Site: $800,000
    • West Restroom & Site: $400,000
  • Location: 980 Northview Park Road

Project Milestones

Milestone Est. Start Est. Completion
Design/Architecture Review July 2024 December 2024
Council/Commission Review September 2024  
Council CIP Approval October 2024  
Council Contract Approval January 2025  
Construction Period August 2025 January 2026
Opening Date Spring 2026  
Sky Hill Athletic Courts

Concepts

Click images for larger versions.

Completed Courts

Click images for larger versions.

The City of Eagan is planning our future fun, connections, and spaces, so we all can thrive.   As a part of our future planning, we are updating Sky Hill Park athletic courts for current and future needs. The City's goal is to continue to use this space as a multi-sport location while enhancing the experience with a higher quality space.  

Background

Four years ago, the City, guided by the Parks and Recreation Master Plan, focused on updating access to the shelter building and the interior and exterior design. The results were updates to the exterior siding, interior wall and flooring, increased storage, updated bathrooms and ADA trail access from the parking lot to the facility. This projected allowed for recreational activities to be hosted inside the facility and for users to have better access to the shelter building.

In 2023, the City conducted a survey of the condition of asphalt tennis courts to assist in prioritizing repairing court surfaces. Sky Hill Park was one of the parks that was in need of repair due to the condition of the surface and the high amount of usage. A repaired court will provide a better experience for basketball, tennis and pickleball players.

We know we can’t plan it alone. We want to hear from our community, including you to help inform its future. Please take a moment to share how you use the space and what you want the City to consider in the design at our online poll or our public meeting on Monday, November 18 5:00 p.m. – 6:00 p.m. in the Sky Hill Shelter building.

Contractors/Consultants: Bolton-Menk
Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.
Project Cost Estimate: $600,000
Location: 3590 Blue Cross Road

Upcoming Events

Event Est. Start Est. Completion
Design/Architecture Review October 2024 November 2024
Public Comment October 21, 2024 (Open House Nov 18) November 29, 2024
Construction Period April 1, 2025 Construction Season 2025
Opening Date Fall/Winter 2025 Fall/Winter 2025
Lexington-Diffley Playground Installation

Concepts

Click images for larger versions.

Contractors/Consultants: Miracle Recreation/Weber Recreational Design
Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.
Project Cost Estimate: $75,000
Location: 4201 Lexington Avenue South

Event Est. Start Est. Completion
Advertisement for Bid/Request for Proposals December 2023 January 26, 2024
Public Comment February 2024 March 2024
Construction Period Construction Season 2024 Construction Season 2024/Spring 2025
Opening Date Spring 2025 Fall 2025
Northview Restroom Building

Contractors/Consultants: Nor-Son Construction
Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.
Project Cost Estimate: $800,000
Location: 980 Northview Park Road

Event Est. Start Est. Completion
Advertisement for Bid/Request for Proposals January 2025 February 2025
Construction Period Construction Season 2025 Construction Season 2025
Opening Date Spring 2026 Spring 2026

Prior Projects

O'Leary Park Playground Replacement

Project Name: O'Leary Playground Replacement

Click images for larger versions.

A playset at O'Leary Park in Eagan

Contractors/Consultants: MWP Recreation / GameTime

Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.

Comp Plan/Master Plan: Supported by both plans

Project Cost Estimate: $50,000

Funding Source: Park Development Fund

Location: 3501 Lexington Avenue South

Event Est. Start Est. Completion
Advertisement for Bid/Request for Proposals December 2023 January 26, 2024
Public Comment

February - March 1, 2024

Please submit information to the above comment box

Construction Period Construction Season 2024 Construction Season 2024
Opening Date September 2024 September 2024
Bur Oaks Tennis Court

The tennis courts at Bur Oaks Park were repaired and resurfaced with new asphalt and acrylic during the 2024 season.

Click images for larger versions.

Project Name: Bur Oaks Tennis Court

Contractors/Consultants: Bituminous Roadways, Inc.

Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.

Comp Plan/Master Plan: Supported by both plans

Project Cost Estimate: $150,000

Funding Source: Park Development Fund

Location: 3421 Rolling Hills Drive

Rahn Park Shelter Building

Summary:

2016: The five-year Parks & Recreation Master Plan identified future improvement needs at Rahn Park. The City has continued to proactively budget and identify this park for redevelopment efforts. Reinvestment projects aim at correcting both deferred maintenance and aid in keeping our parks up to date and flexible for organized and passive recreation use.

2020: Improvement dollars were approved by the City Council for a two-phase approach at Rahn Park.

2021: The existing tennis and basketball courts were constructed in the mid-1980s. Phase 1 would focus on outdoor improvements to the site.

2022: The existing warming house/park building was built in 1974. Phase 2 would focus on the warming house/park building remodel.

Project Name: Rahn Park Building Renovation

Contractors/Consultants: LHB Architects

Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.

Comp Plan/Master Plan: Supported by both plans

Project Cost Estimate: $650,000

Funding Source: Park Development Fund

Location: 4425 Sandstone Dr.

Event Est. Start Est. Completion
Engagement - Open House

Nov. 15, 2021 - Open House

4425 Sandstone Dr., 5:30-6:30 p.m.

Can't make it or prefer to provide input virtually? Click here to provide feedback on park amenities at this site: polco.us/shx8pm

Nov. 15, 2021 - Open House

4425 Sandstone Dr., 5:30 -6:30 p.m.

Can't make it or prefer to provide input virtually? Click here to provide feedback on park amenities at this site: polco.us/shx8pm

Design/Construction Documents May 2021

November 2021

Advertisement for Bid/Request for Proposals December 2021 Bid opening: Jan. 12, 2022
Construction Period February 2022 December 2022
Opening Date December 2022 December 2022
Rahn Park Connection Trail

Summary: A new paved trail connection between Rahn Athletic Park and Rahn Park offers better accessibility to park amenities. The trail connection provides more user-friendly and ADA-compliant access to all park amenities in both parks. These amenities include restrooms, ballfields, open play space, nature trails, sport courts, playgrounds, volleyball, and access to additional trail connections to the city-wide system.

Project Name: Rahn Park Connection Trail

Contractors/Consultants: TBD

Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it.

Comp Plan/Master Plan: Supported by both plans

Project Cost Estimate: $175,000

Funding Source: Park Development Funds and MN DNR Local Trail Connections Grant

Location: 4425 Sandstone Drive

Event Est. Start Est. Completion
Advertisement for Bid/Request for Proposals TBD TBD
Construction Period May 2022 December 2022
Opening Date December 2022 December 2022
Public Art

For more information on Public Art Installation please visit cityofeagan.com/public-art

Additional Projects

The City of Eagan Parks and Recreation Department annually completes projects that add additional amenities/value to sites that are completed with City staff or are lower cost.

  • Off Leash Dog Park (OLDA) - The OLDA small dog area will receive fencing improvements.
  • Playground surfacing - Quarry Park and Trapp Farm Park will have pea gravel playground surfacing removed and have fiber wood chips installed to assist with accessibility.
  • Northview Athletic Building - Design and create construction documents for the concession/storage/bathroom building near the softball fields at Northview Park.
Goat Hill Park Rink

Summary:The City of Eagan is partnering with the local youth hockey association, Eagan Hockey Association (EHA) to increase access to outdoor skating in the winter and create a year-round community space with the construction of a refrigerated ice rink and pavilion covering at Goat Hill Park. The multi-phased project will begin this fall with installation of a concrete rink with a chiller system, that once built, will provide access to outdoor skating as early as October and as late as March.

EHA has presented the City with a commitment of $1.3 million in funding to pay for the first phase of developing a covered, outdoor rink that would support the city's goal of developing a destination winter recreation facility per the 2015 Parks Master Plan.

Partnership Background: In October of 2018, the EHA approached the City of Eagan with an idea to partner on a mini refrigerated rink as an experiment at Pilot Knob Park. That winter, a successful partnership provided a variety of experiences for both park users, as well as EHA membership and inspired a larger partnership to be considered.

Project Name: Goat Hill Park Rink

Contractors/Consultants: All American Ice LLC, Max Steininger Inc., 292 Design Group

Staff Lead: Chris Fleck, facility and project manager, 651-675-5557

Comp Plan/Master Plan: Supported by both plans

Project Cost: $1,300,000.00 Projected Cost

Funding source: 100% Donated Funds

Location: 4391 Lexington Ave. S.

Event Est. Start Est. Completion
Engagement Process

July 2021

Survey was provided on the City of Eagan website. For additional comments please email This email address is being protected from spambots. You need JavaScript enabled to view it.

July 2021

Survey was provided on the City of Eagan website. For additional comments please email This email address is being protected from spambots. You need JavaScript enabled to view it.

Design/Construction Documents July 2021 September 2021
Advertisement for Bid/Request for Proposals July 2021 September 2021
Construction Period September 2021 December 2021
Opening Date TBD TBD

Project Update

Oct. 28, 2021

Earthwork has prepared the site for rink construction. Perimeter concrete work has begun and is currently being coordinated around the edge of the future rink. Following the perimeter concrete process - contractors will work towards preparing the interior (rink) slab, weather permitting.

Nov. 11, 2021

Rahn Park Court Renovation

Summary:

Now Open - Oct. 11, 2021

The existing tennis and basketball courts were originally constructed in the mid-1980s. The courts have received typical crack maintenance past three decades but are now deemed unrepairable. New court spaces may include play for basketball, tennis, and pickleball. Construction concepts are being developed for additional parking spaces which may include off-street parking along Sandstone Drive and possible use of the east hockey rink as temporary or seasonal parking; the hockey rink will still be available for winter skating. Plans are also being developed for renovating the existing trail connection to the courts to meet ADA code. The existing court lights will be refurbished with energy-saving LED fixtures. Additional work will be included in this project to mitigate water runoff from the courts before entering the nearby pond. New site amenities will include benches and additional landscaping.

Project Name: Rahn Park Courts

Contractors: WSB

Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it., 651-675-5329

Comp Plan/Master Plan: Supported by both plans

Project Cost: $500,000.00 Projected Cost

Funding source: 100% Park Dedication Fund

Location: 4425 Sandstone Drive

Event Est. Start Est. Completion
Engagement Process November 16, 2020 - Cancelled November 16, 2020 - Cancelled
Design documents January 2021 January 2021
Construction Period April 2021 September 2021
Advertisement for Bid March 2021 March 2021
Bid Opening March 2021 March 2021
Opening Date - Now Open October 11, 2021 October 11, 2021
Cinnamon Ridge Park Playground Replacement

Summary:

The existing playground and swingset will be removed from the site. The swingset container will be completely removed and seeded with the replacement swingset being installed in the playground container.

Project Name: Cinnamon Ridge Park Playground Replacement

Contractors: Flagship Recreation / Landscape Structures

Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it., 651-675-5505

Comp Plan/Master Plan: Supported by both plans

Project Cost: $55,200.00 Projected Cost

Funding source: 100% Park Dedication Fund

Location: 4480 Slater Road

Event Est. Start Est. Completion
Request for proposal December 2020 Dec. 18
Document Review December 2020 January 2021
Construction Period June 2021 August 2021
Opening Date August 2021 August 2021
Festival Grounds Entrance

Summary:

The existing entrance shade structure will be removed from the site. The site will have additional landscaping installed surrounding the entrance to match the existing park landscaping. The site will also have two vertical signs installed at the entrance.

Project Name: Festival Grounds Entrance

Contractors: Schnell Designs

Staff Lead: This email address is being protected from spambots. You need JavaScript enabled to view it., 651-675-5505

Comp Plan/Master Plan: Supported by both plans

Project Cost: $25,000.00 Projected Cost

Funding source: 100% Park Dedication Fund

Location: 1507 Central Parkway

Event Est. Start Est. Completion
Request for proposal January 2021 January 2021
Document Review February 2021 March 2021
Construction Period April 2021 May 2021
Opening Date June 2021 June 2021